At Lapis Residence, Block L1 is registered and handover to its owners comes next. On Block L4, three of the four façades are fully insulated.
Inside L4, all electrical, plumbing and heating installations are complete on the first floor, the screed is poured and bathroom tiling has begun. Installations are also complete on the second and third floors, ahead of the screed, while plasterboard works progress on the upper floors.
- Block L1
- Registered · handover next
- Block L4
- 3 of 4 façades insulated
- Block L2
- Sold out